Projects, Labels, and Due Dates #79
timkeefer1
started this conversation in
General
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
-
Just got rolling on Obsidian this morning, and as a dedicated Todoist user, I LOVE what this plug-in is doing! Kudos! I have noticed a few things that made me go "Huh, is it supposed to do that?" that I'm not sure if it's my inexperience with Obsidian or this plug-in.
Does it have to replicate the "todoist" label out to TD? This stamps every synced task with that same label - which I guess I could use to figure out which ones came from Obsidian, but shouldn't they be labeled "Obsidian" then instead?
It is adding the project name as a Shared Label in TD - is that expected? This means I'll have both projects and shared labels with the same names in TD? This is sort of related to the question above - is there a way to have it just drop in the folder without creating the label?
When using a due date, it is assigning an 8AM time to the due date - rather than just leaving it blank like when specifying a date in other TD clients. Am I specifying the date wrong?
Does it matter where I put the "#todoist" tag in the task line? Can it be located anywhere in the task line - or does it have to be at the end like the example shows? Reaason I ask is that I'd like to create a two hotkeys or text expansion that automatically creates the task item and tags it with "#todoist" - and another one that does that and adds the calendar emoji so I can easily specify the date. If the "#todoist" tag has to be at the end of the task line, then I can't do this idea
Thanks in advance for any thoughts or feedback! Again - A+ for the plug-in!!
Beta Was this translation helpful? Give feedback.
All reactions