- Sprint Name: 4Ecks
- Scrum Master: MaG
- Dashboards
- Deployed environments
- master deployment
- https://staging.osparc.io/ [testers only]
Issue | Title | Presenter | Status | Duration (mins) | Time |
---|---|---|---|---|---|
#54 | Platform Resource Management | SAN | In progress | 5min | |
#6 | DevOps, S-D21, Y3M1-12 | SAN | In progress | 10min | |
#502 | Control Center (M12, MS8.1/2,D8.1/2) | IP | In progress | 10min | |
#505 | Large Models/Results Rendering & Interaction (M9; D4.a) | MaG,PC,OM | In progress | 15min | |
#21 | simple creation of data-processing modules, S-D7, Y3M2,4,5,2-12 | PC | In progress | 2min | |
#510 | EM Simulator Service (M9; MS4.2,D4.1) | PC | In progress | 5min | |
#1065 | DRC feedback/issue collection and tracking (Infrastructure) - J-D21 | KZ | Review | 5min | |
#68 | everybody at z43 uses osparc for python/matlab scripting | PC | In progress | 5min | |
#1121 | Export Studies | OM | In progress | 5min |
Deliverable | Due | Title | % Done | Notes |
---|---|---|---|---|
J-D3 | M1 | Retreat prep | 100 | Retreat has taken place |
J-D15 | M1 | Documentation agreement | 75 | Requirements established |
S-D26 | M1 | Idea Lab subaward | 100 | The subaward has been setup and preparations are ongoing |
S-D2 | M2 | OpenCOR / CellML module & PMR S-D2, M2 #1069 | 50 | First version implemented, will be revisited as part of the simplified creation of data analysis services task |
J-D33 | M2 | Publication linking, J-D33, Y3M2,8 #33 | 75 | Meta-data sections throughout SIM-CORE support linking to pdf, webpages; awaiting MAP-CORE functionality to automatically surface publications (based on DOI?) |
J-D3 | M2 | Retreat | 100 | |
J-D6.a | M2 | Conference list | 0 | |
J-D21 | M2 | DRC feedback/issue collection and tracking (Infrastructure) - J-D21 #1065 | 100 | |
J-D28.a | M2 | Portal testing (Testing and Infrastructure) - J-D28 #1066 | oSPARC end-to-end testing infrastructure established | |
J-D7.a | M2 | simple creation of data-processing modules, S-D7, Y3M2,4,5,2-12 #21 | 25 | survey drafted, work on functionality started |
S-D24 | M2 | UI/UX subaward | 100 | first phase contracted, ongoing |
S-D7 | data analysis and visualization | 25 | survey has been drafted | |
S-D3g | metrics | 75 | metrics have been selected and prepared for presentation to steering committee | |
- S-D18: decaying rat prevents reimaging required to properly segment the PNS; registration-based approach will be tried, to merge PNS images from previously scanned rat
- S-D9: Gazelle requires support in scheduling their meetings and calls with focus groups, stake owners, etc.