There is an error in the cashflow for the PV-Wind-Battery/TPO Host-Developer configuration where it cannot find <cf_land_lease_expense> (see screenshot). Present in version 2023.12.17. I suspect that the land lease is not supposed to be included in the cashflow in this configuration. This bug does NOT exist in the 3 other hybrid configs that use PVWatts, nor in Detailed PV/TPO Host-Developer.
The text was updated successfully, but these errors were encountered:
There is an error in the cashflow for the PV-Wind-Battery/TPO Host-Developer configuration where it cannot find <cf_land_lease_expense> (see screenshot). Present in version 2023.12.17. I suspect that the land lease is not supposed to be included in the cashflow in this configuration. This bug does NOT exist in the 3 other hybrid configs that use PVWatts, nor in Detailed PV/TPO Host-Developer.
The text was updated successfully, but these errors were encountered: