Skip to content

Update rock to v1.1.0 #200

Update rock to v1.1.0

Update rock to v1.1.0 #200

Triggered via pull request January 13, 2025 15:41
@kelkawi-akelkawi-a
synchronize #20
update-v1.x
Status Failure
Total duration 6h 0m 37s
Artifacts 2

integration_test.yaml

on: pull_request
integration-tests  /  Plan
7s
integration-tests / Plan
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
integration-tests  /  Plan Image Scanning
0s
integration-tests / Plan Image Scanning
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Matrix: integration-tests / scan
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 3 warnings
integration-tests / Build rock (airbyte)
The job running on runner GitHub Actions 233 has exceeded the maximum execution time of 360 minutes.
integration-tests / Build rock (airbyte)
The operation was canceled.
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.
integration-tests / Plan
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
integration-tests / Build charm (airbyte-k8s)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
integration-tests / Required Integration Test Status Checks
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
2025-01-13T15-41-46-9086__build__output__charm__airbyte-k8s
23.4 MB
2025-01-13T15-41-46-9086__plan
338 Bytes