Skip to content

fix: general fixes and add crypto polyfill #9511

fix: general fixes and add crypto polyfill

fix: general fixes and add crypto polyfill #9511

Triggered via push January 19, 2025 08:08
Status Failure
Total duration 3m 35s
Artifacts

jest-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

20 errors and 1 warning
test (20.x, utils)
@osmosis-labs/utils#test: command (/home/runner/work/osmosis-frontend/osmosis-frontend/packages/utils) /tmp/yarn--1737274266941-0.052945579145356136/yarn run test exited (1)
test (20.x, utils)
Process completed with exit code 1.
test (20.x, pools)
The job was canceled because "_20_x_utils" failed.
test (20.x, pools)
The operation was canceled.
test (20.x, server)
The job was canceled because "_20_x_utils" failed.
test (20.x, server)
The operation was canceled.
test (20.x, proto-codecs)
The job was canceled because "_20_x_utils" failed.
test (20.x, proto-codecs)
The operation was canceled.
test (20.x, tx)
The job was canceled because "_20_x_utils" failed.
test (20.x, tx)
The operation was canceled.
test (20.x, web)
The job was canceled because "_20_x_utils" failed.
test (20.x, web)
The operation was canceled.
test (20.x, stores)
The job was canceled because "_20_x_utils" failed.
test (20.x, stores)
The operation was canceled.
test (20.x, bridge)
The job was canceled because "_20_x_utils" failed.
test (20.x, bridge)
The operation was canceled.
test (20.x, unit)
The job was canceled because "_20_x_utils" failed.
test (20.x, unit)
The operation was canceled.
test (20.x, math)
The job was canceled because "_20_x_utils" failed.
test (20.x, math)
The operation was canceled.
test (20.x, utils)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636